TEL. 0584-32-1222
613-1 Naoe, Yoro-cho, Yoro-gun, Gifu Prefecture
503-1337
N2U-BRIDGE New Bridge (Nagoya University Campus) |
|
Position comparison with steel inspection passage |
Factory temporary assembly inspection |
FRP inspection passage has superior durability compared to steel products
especially in corrosive environment due to salt damage etc. It can fully
demonstrates its performance and contributes to reduction of maintenance
costs. In addition, the lightweight FRP inspection passage has excellent
workability and can expand the range of manual work.
613-1 Naoe, Yoro-cho, Yoro-gun, Gifu Prefecture
503-1337
TEL 0584-32-1222
FAX 0584-32-0308